  "title": "Interconnection Process",
  "description": "Process for connecting new generation, transmission, and load facilities to the transmission system.",
  "language": "en",
  "tags": [
    "nyiso",
    "process"
  ],
  "related": [
    "interconnection",
    "transmission-interconnection-procedures"
  ],
  "aliases": [
    "Interconnection Study"
  ],
  "breaking": false,
  "dates": {
    "created": "2025-11-01",
    "last_modified": "2025-11-03"
  },
  "authors": [
    {
      "name": "Jinning Wang",
      "url": "https://jinningwang.github.io/"
    }
  ],
  "content": {
    "sections": [
      {
        "order": 1,
        "id": "definition-by-nyiso",
        "title": "Definition by NYISO",
        "type": "definition",
        "source_keys": [
          "nyiso2025interconnectionprocess"
        ],
        "page": null,
        "body_md": "> The NYISO's Interconnection processes enable parties to pursue construction and interconnection of new and materially modified generation, transmission, and load facilities to the NYS Transmission System and Distribution System.\n"
      }
    ]
  }
}